| Mr. Jeroen Adema, hydraulic
engineer, joined Alkyon per September 1998. |
|
|
| Mr. Gijs van Banning, a
civil and hydraulic engineer, holds the position of Manager Coastal
and Marine Systems and joined Alkyon per October 1996. |
|
|
| Mr. Peter van den
Bosch, a senior
software engineer, joined Alkyon per July 1997.
|
|
|
| Dr. Zhiwen Chen, a
hydraulic engineer, joined Alkyon per August 1996.
|
| Dr. Jelmer Cleveringa a project manager, joined Alkyon per May 2006. |
| Mrs. Henrita Corporaal, an
administrator, joined Alkyon per January 1999. |
|
|
|
|
|
| Dr. Bart Grasmeijer, a project engineer, joined Alkyon per January 2007. |
| Mr. Jaap de Groot, a project manager, joined Alkyon per May 2006. |
| Mr. Amir
Haghgoo,
a project manager, joined Alkyon per December 2007.
|
|
|
|
| Miss Ellen Hofman, holds
the position of Office Manager and joined Alkyon per April 2004.
|
| Mr.
Diederik van Hogendorp, a project engineer, joined Alkyon per
January 2009. |
|
|
| Mrs. Belinda Kater, a project manager, joined Alkyon per March 2007 |
|
| Mr. Jurriaan Lambeek, a project manager, joined Alkyon per September 2005. |
| Dr. Giordano
Lipari, a project engineer, joined Alkyon per February 2008.
|
|
|
| Mrs. Anneke Mooiweer, a
secretary, joined Alkyon per November 1996.
|
|
| Mr. Martijn Onderwater,
a morphological engineer, joined Alkyon per August 1997. |
|
| Mr. Jan van Overeem, a
civil and hydraulic engineer, holds the position of Director and
joined Alkyon per July 1996.
|
| Mr. Luitze Perk, a project engineer, joined Alkyon per February 2006. |
| Mr. Michiel van Reen, a civil engineer,
joined Alkyon per August 2003. |
| Mr. Peter Santbergen, a software engineer,
holds the position of Facility Manager and joined Alkyon per June 1996.
|
| .
|
| Mr.
Roelant Snoek,
a project engineer, joined Alkyon per January 2009. |
| Dr. Henk Steetzel, a
civil and hydraulic engineer, holds the position of Director Special
Products and joined Alkyon per August 1996.
|
| Mr. Rob Steijn, a
civil engineer, holds the position of Director Coastal & Marine
Systems and joined Alkyon per October 1996. |
| Mr. Hans Veldman, a
senior engineer, joined Alkyon per September
1998. |
| Mr. Ferry Vis, a
mathematical and hydraulic engineer, holds the position of Director
Ports and Marine Structures and joined Alkyon per September
1996.
|
| Dr. Gerbrant van Vledder, a
civil and hydraulic engineer, joined Alkyon per March 1997.
|
|
|
|
|